Custom Wall Socket Light Glass Touch Switch Panel Electrical Toughened
Product Details:
Place of Origin: | china |
Brand Name: | AH |
Certification: | ISO90001,IATF16949 |
Model Number: | TCG-0015 |
Payment & Shipping Terms:
Minimum Order Quantity: | 100 |
---|---|
Price: | USD12pcs |
Packaging Details: | wooden box |
Delivery Time: | 2-4weeks |
Payment Terms: | T/T |
Supply Ability: | 100000pcs/M |
Detail Information |
|||
Shape: | Rectangle | Size: | 40inch |
---|---|---|---|
CNC: | Yes | Printing: | Yes |
Thickness: | 1.1mm | Application: | Touch Panel |
Raw Material: | Soda Lime | Touch Function: | Yes |
Interface Type: | USB | Type: | Capacitive |
High Light: | Electrical Toughened Touch Switch Panel,Wall Socket CNC Touch Switch Panel,1.1mm Toughened Glass Panel |
Product Description
Custom Wall Socket Light Glass Touch Switch Panel Electrical Toughened
Custom Wall Socket Glass Switch Panel Light Switch Glass Electrical Touch Switch Toughened Glass Panel







Products field:
Awards and honors:
Patent certificate:
Production Line show:
Inspection Lab show:
Lead time:
- For goods in stock, 2-3 days after PO.
- For customized samples, 1weeks after the confirmation of price and drawing.
- For mass production, 3-4 weeks after PO.
Shipment service:
FedEx, SF etc.
Packing Method show:
Q&A
Q. Are you a trading company or manufacturer?
A: We are a manufacturer.
Q: What do I need to offer to get a quote ?
A: Please offer 2D or 3D drawings (material, dimension, tolerance, surface treatment and other technical requirement etc.) ,quantity, application or sample.Then we will quote the best price within 24hours.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample.After price confirmation, you can require for samples to check our quality.
Q. What’s your lead time?
A: The lead time for samples is 2weeks and mass production is 3-4weeks.
Q. What kind of products can you provide?
A: We can provide cover glass, touch panel, electromagnetism screen, integrated touch machine, touch module, smart window, harden film, conductive film ect..
Q: How long is your delivery time?
A: Generally it is 5-10 working days if the materials are in stock. or it is 10-15 working days if materials are not in stock, it is according to quantity.